Supplying contingent staffing solutions across the UK Infrastructure Sector

Construction | Engineering | Industrial | Logistics | Rail | Plant & Fleet

Hampton Bridge lifted into place

Oct 1, 2026 | News

The main span of the Moxon Architects-designed 210m Hampton Bridge, part of a planned all weather active travel route over the Evesham flood plain, has been lifted into place.

Read Full Article: The Construction Index